AgilFreightChina — Ukraine

Machinery from China, turnkey — CNC machines, fiber lasers, injection moulding and production lines

Machinery from China for your production floor — CNC lathes and machining centres, 1–6 kW fiber laser cutters, press brakes, injection moulding machines, extruders and complete lines — bought at the factory, accepted after a test run and delivered turnkey to your plant. Up to 16% cheaper than Ukrainian dealers, and companies that qualify for the relief pay no import VAT on top of that.

up to −16%
vs. Ukrainian prices
0–5%
duty on machines and lines
35–45 days
factory to your plant
Industrial machinery from China
In China
from $9,500
Turnkey in Kyiv
from $13,500
In Ukraine
from $15,500
Saving
up to −16%

Prices as of 11.2026 for base configurations. The CNC control (Fanuc, Siemens, GSK, Delem), laser source (Raycus, MAX, IPG) and line output change the price — fixed in a quote within 24 hours.

Production machinery prices: China, turnkey, Ukraine

CNC lathe CK6150

Ø500 swing, 1000–1500 mm between centres, GSK / Siemens / Fanuc

−13%
China (FOB)
$9,500–14,000
Turnkey, Kyiv
from $13,500
In Ukraine
$15,500–22,000

4 per 40HC

CNC press brake 100 t × 3200 mm

hydraulic, Delem DA53T / Estun E21, 2–4 axis backgauge

−13%
China (FOB)
$11,500–18,000
Turnkey, Kyiv
from $18,800
In Ukraine
$21,500–30,000

2 per 40HC

Fiber laser cutter 3 kW

3000×1500 mm bed, Raycus / MAX source, Cypcut; 1.5–6 kW options

−16%
China (FOB)
$14,000–20,000
Turnkey, Kyiv
from $21,700
In Ukraine
$26,000–38,000

2 per 40HC

Vertical machining centre VMC850

CNC milling, 800×500×500 mm travel, BT40, 24-tool changer

−15%
China (FOB)
$17,000–26,000
Turnkey, Kyiv
from $25,500
In Ukraine
$30,000–42,000

2 per 40HC

Injection moulding machine 160–200 t

servo drive, 300–600 g shot, Haitian / Borche / Powerjet

−13%
China (FOB)
$22,000–34,000
Turnkey, Kyiv
from $30,500
In Ukraine
$35,000–50,000

2 per 40HC

HDPE pipe extrusion line 20–110 mm

SJ65/33 extruder, vacuum and cooling tanks, haul-off, cutter, stacker

−11%
China (FOB)
$32,000–50,000
Turnkey, Kyiv
from $46,500
In Ukraine
$52,000–75,000

whole line in one 40HC

Turnkey = factory price + delivery to Kyiv + 0–5% duty + 20% VAT + broker. VAT-registered companies recover the VAT, and qualifying companies don't pay it at all — the price is then lower by the VAT amount. Ukrainian prices are average offers from dealers of Chinese machinery.

Calculate your turnkey price

Pick a model and quantity — the calculator adds freight, duty, VAT and broker and compares with the Ukrainian price.

Quantityunit
› Adjust price, freight and duty

Turnkey in Kyiv · 1 units

$25,479

$25,479 per unit · For a VAT payer, excl. VAT: $21,366

You save

$6,521

−20%

What the price is made of

  • Goods$17,000
  • Freight to border$2,775
  • Duty$791
  • VAT 20%$4,113
  • Delivery in Ukraine$500
  • Broker & paperwork$300

Compared with the Ukrainian price

Ukrainian dealer$32,000
From China, turnkey$25,479

Estimate only: exchange rate, freight and factory price change. We lock the exact amount in a quote within 24 hours.

Example: 2 fiber laser cutters of 3 kW in one container

A sheet-metal shop buys two 3 kW lasers with a 3000×1500 mm bed. All amounts are for the batch.

Factory price (FOB) × 2$28,000
Freight to the Ukrainian border (sea + EU port + truck)$5,550
Customs value$33,550
Import duty 4%$1,342
VAT 20% (recoverable for VAT-registered companies)$6,978
Delivery within Ukraine to Kyiv$1,000
Broker, certificates, paperwork$600
Total turnkey$43,470
Per unit$21,735

Saving vs. Ukrainian dealer price: $8,530 (−16%)

How we ship machines and production lines

Machines travel 2–4 per 40-foot container: on wooden skids, fixed to the floor, with anti-corrosion preservation and desiccants. Extrusion lines are split into modules and loaded with a packing list for every piece. Large presses, lasers with a 6 m bed and big lines go on flat racks and open tops. Loading photos and cargo insurance on every shipment.

Transit
35–45 days to plant
CNC machines
2–4 per 40HC
Injection moulding & extrusion
1–2 units or a line per 40HC
Out of gauge
flat rack, open top

Duty and VAT on machinery from China (Ukraine)

Most machines and lines enter Ukraine at 0–5% duty — the rate depends on the HS code, so we check classification before the contract is signed. No excise. 20% VAT is charged on the customs value plus duty, but industrial park residents and new manufacturers in certain communities import equipment VAT-free — we'll check for free whether you qualify.

CNC lathes — HS 8458 11 80 00 (turning centres 8458 11 20 00 — 3%)
duty 0%
CNC press brakes — 8462 23 00 00; CNC hydraulic presses — 8462 61 10 00
duty 5%
Fiber laser cutting machines — 8456 11 90 00
duty 4%
Machining (milling) centres — 8457 10
duty 4%
Injection moulding 8477 10 and extruders 8477 20
duty 0%
Block and paver lines 8474 80, packaging 8422 40
duty 0%
VAT
20% (0% with relief)

Rates per the Customs Tariff of Ukraine (Law No. 2697-IX), valid as of 11.2026. VAT-free: industrial park residents (new equipment, 5 years of intended use); new manufacturers under Tax Code Section XX, Subsection 10, item 68 — until 31.12.2036, procedure per Cabinet Resolution No. 1149 of 03.11.2023.

Customs Calculator

Machinery from China without import VAT: who qualifies

Our calculation always includes 20% VAT — that's what most importers pay, and VAT-registered companies then recover it as input VAT. But some regimes remove import VAT altogether. Industrial park residents in manufacturing import new production equipment (no older than 3 years) free of duty and VAT, provided it stays in its intended use for 5 years. New companies set up after 01.01.2022 in designated communities of the Volyn, Lviv, Donetsk and Luhansk regions are exempt from VAT on equipment for their own production until 31.12.2036 — if they are in manufacturing, employ at least 10 people, earn up to UAH 40 million a year and get over 90% of revenue from their own products. If your company meets the criteria, we'll check it for free; with the relief the turnkey price drops by the VAT amount — about $3,500 for a 3 kW laser.

Commissioning, training and service

A machine that isn't running is just steel, so commissioning goes into the quote from day one. A factory engineer comes to your site: levels the machine, connects power and air, sets up the CNC, cuts test parts from your material and trains operators and the process engineer — usually 3–7 days; the engineer's flights and per diem are a separate line, no surprises. Before shipping you get the foundation, power and compressed-air requirements. After that: remote diagnostics via the controller and video call, a spares and consumables kit (nozzles, lenses, filters, seals) in the same container, and factory parts by air in 5–10 days. Manuals come in English.

Production lines: pavers, bricks, AAC blocks, pellets, packaging

Beyond single machines, we source complete lines: vibro-presses for paving stones and blocks, brick plant equipment, AAC (aerated concrete) lines, 0.5–3 t/h pellet lines, filling and packaging machines, and extruders for pipe, profile, film and animal feed. Lines are matched to your raw material and output: we send the factory samples of your clay, aggregate, sawdust or resin, and the line is tested on them. The factory provides the plant layout, foundation drawings and utility list before shipping, so you prepare the site while the equipment is at sea. A line arrives in 2–6 containers with every module marked and a packing list; most such lines carry 0% duty. Installation supervision and start-up are done by the factory crew together with your mechanics.

Why it pays to work with us

Pre-shipment inspection

Test run at the factory: trial cut, accuracy measurement, completeness check — photos, video and a report before the balance payment.

Commissioning and training

A factory engineer starts the equipment at your site and trains operators, followed by remote diagnostics.

VAT relief check

We check for free whether your company can import equipment VAT-free and prepare the paperwork.

Fixed turnkey price

The quote shows the final amount to your plant: factory, freight, duty, VAT, broker, start-up. No surprise charges at the border.

How we work

  1. 1

    Request

    What you make, material, thickness, output — we estimate the turnkey price in 15 minutes.

  2. 2

    Shortlist and quote

    Within 24 hours: 2–3 factories with photos, running videos, specification and a fixed turnkey amount.

  3. 3

    Contract and production

    Contract with a Ukrainian company, 30% deposit to the factory. Stock machines ship in 7–15 days, built-to-order in 20–45 days.

  4. 4

    Factory acceptance

    Test run on your samples, accuracy report, lashing in the container, insurance.

  5. 5

    Delivery, customs, start-up

    Duty, VAT and broker — on us. We deliver to your plant, the engineer commissions and trains your operators.

In this category we also ship

FAQ: Industrial machinery from China

How much does machinery from China cost turnkey?
A CK6150 CNC lathe — from $13,500 turnkey in Kyiv, a 100 t press brake — from $18,800, a 3 kW fiber laser — from $21,700, a VMC850 machining centre — from $25,500, a 160–200 t injection moulding machine — from $30,500, an HDPE pipe line — from $46,500. Prices include duty, 20% VAT and freight.
How much is a 3 kW fiber laser cutting machine from China?
A 3 kW laser with a 3000×1500 mm bed and a Raycus or MAX source — from $14,000 ex-works and from $21,700 turnkey in Kyiv. Ukrainian dealers sell comparable machines for $26,000–38,000. 1.5 kW models cost less, 6 kW and enclosed versions more.
Can I import machinery from China without VAT?
Yes, if your company qualifies: an industrial park resident in manufacturing, or a new manufacturer in designated communities under Tax Code item 68 (until 31.12.2036). The turnkey price then drops by the 20% VAT — about $3,500 for a 3 kW laser. We check eligibility for free.
How much is a Chinese CNC machine like a CK6150 lathe?
A CK6150 with a GSK control — from $9,500 ex-works and from $13,500 turnkey. Horizontal CNC lathes carry 0% duty, and 4 fit in a 40-foot container, so freight comes to about $1,600 per machine.
What is the import duty on machine tools from China?
CNC lathes — 0%, machining centres and fiber lasers — 4%, CNC press brakes and presses — 5%, injection moulding machines, extruders, block lines and packaging machines — 0%. Plus 20% VAT, no excise.
Who commissions the equipment and trains operators?
A factory engineer at your site: installation, CNC setup, test parts and training — usually 3–7 days. The engineer's flights and per diem are shown as a separate line in the quote.
What about warranty and spare parts?
Factories usually give a 12-month warranty. We ship a spares kit with the equipment, further parts arrive by air in 5–10 days, and most issues are solved by remote diagnostics through the controller.
How long does machinery take from China?
Stock machines leave the factory in 7–15 days, built-to-order in 20–45 days. Delivery to your plant takes 35–45 days by sea via Gdańsk or Constanța.

We also ship from China

Get a turnkey price within 24 hours

Send the model, quantity and delivery city — a manager will reply with a fixed-price quote.

  • up to −16% — vs. Ukrainian prices
  • 0–5% — duty on machines and lines
  • 35–45 days — factory to your plant

Request a quote

Tell us what you need: model, quantity, delivery city. We'll quote the turnkey price — freight, duty and VAT included.

Approximate cargo weight

By clicking the button, you agree to the processing of your contact details for preparing the quote.

Related resources