
Energy equipment from China: BESS battery storage, substations, CHP and gensets delivered turnkey
Energy equipment from China for utilities, solar and BESS integrators, industrial sites and housing associations: battery energy storage systems, wholesale solar panels, package substations, CHP units, diesel gensets and EV chargers — in one shipment. We vet the manufacturer, run factory acceptance and ship Li-ion as dangerous goods on a fast route via Rotterdam or Antwerp: 5–6 weeks to site instead of the ~2 months typical on the market. Price your energy kit below.
- 5–6 weeks
- to site instead of ~2 months on the market
- −14%
- on a typical energy kit vs. Ukrainian prices
- 0% VAT
- on BESS and panels under exemption 245 until 31.12.2028
Energy equipment from China: prices by category
Each category is a full catalog page with models, factory prices, a turnkey Kyiv price and Ukrainian distributor prices. BESS, Li-ion batteries, solar panels, inverters and EV chargers carry 0% duty; gas-engine CHP units and diesel gensets 5%; power transformers for substations 10%. Turnkey prices in the catalog include 20% VAT and ignore exemption 245.
In China from $8,500Energy equipment
BESS, solar panels, substations, CHP, EV chargers
Turnkey in Kyiv: from $11,000up to −23%
In China from $2,600Diesel generators
30–2000 kVA: Weichai, Cummins, Perkins
Turnkey in Kyiv: from $4,300up to −29%
In China from $17,500Electric cars
BYD, Zeekr, Avatr, Li Auto, Leapmotor
Turnkey in Kyiv: from $23,500up to −24%
A typical energy kit for an industrial site
A containerised 1 MW / 2 MWh BESS, two containers of solar panels (≈ 0.9 MW), a 1000 kVA package substation, a 500 kVA standby diesel genset and two 120 kW DC chargers for the fleet. The calculator includes 20% VAT; under exemption 245 the BESS and panels enter free of duty and VAT, so the total will be lower still.
Containerised BESS 1 MW / 2 MWh — 20 ft, LFP 314 Ah, liquid cooling, PCS, EMS, fire suppression; up to 5 MWh options
Energy equipment · Prices & models1Turnkey
$258,900
Solar panels wholesale — container — 720 × 620 W TOPCon bifacial ≈ 446 kW, Tier-1
Energy equipment · Prices & models2Turnkey
$136,120
Package substation 1000 kVA 10(6)/0.4 kV — oil-immersed transformer, 10 kV RMU, 0.4 kV LV board, kiosk enclosure
Energy equipment · Prices & models1Turnkey
$40,406
Diesel genset 500 kVA — 400 kW, Cummins / Perkins / Weichai
Diesel generators · Prices & models1Turnkey
$45,827
DC fast charger 120 kW — 2 × CCS2 (GB/T, CHAdeMO optional), OCPP 1.6J, CE; 60–240 kW range
Energy equipment · Prices & models2Turnkey
$28,700
Kit turnkey in Kyiv
$509,953
For a VAT payer, excl. VAT: $426,419
Saving on the kit: $83,048 (−14%)
Factory prices, freight, duty and VAT per catalog data as of 11.2026. We lock the exact amount in a quote within 24 hours.
The fast route, and Li-ion as dangerous goods
The market usually takes about two months to deliver battery energy storage systems: sea freight to Gdańsk or Constanța, dangerous-goods waiting time in port, transhipment. We route equipment via Rotterdam or Antwerp on lines that routinely accept class 9 and truck it on to site — 5–6 weeks from factory to site, a cycle 30–40% shorter. Lithium-ion systems are class 9 dangerous goods: UN3480 for batteries shipped alone, UN3481 for batteries inside equipment, UN3536 for containerised BESS. Before shipment we prepare the MSDS, UN38.3 test summary, dangerous-goods declaration and labels — our battery and dangerous goods shipping service. Modules and cells for urgent repairs fly by air at up to 30% state of charge. For projects with grant deadlines and grid-connection dates, those three weeks of margin often decide everything.
Exemption 245, donor programmes and tenders
Until 31.12.2028 exemption 245 of the Tax Code applies: BESS and Li-ion batteries from 100 Ah, solar panels, inverters over 7.5 kVA and gas-engine units enter Ukraine free of duty and VAT. For a 215 kWh cabinet that is ≈ $6,200 off, for a container of panels about $10,000. The exemption depends on the HS code and battery capacity, so we check every line before the contract — the customs duty calculator gives a first estimate. Projects funded through the Energy Community follow Cabinet Resolution No. 860 of 15.07.2025, and other donor-funded energy reconstruction projects can also qualify for duty and VAT relief — we check whether your site does. For tenders and grant applications we issue, within 24 hours, a quote with a fixed turnkey price, factory specification and a letter of guarantee on delivery time.
Manufacturer vetting, FAT and engineering support
The biggest risk in energy is not the price but a manufacturer assembling cabinets from someone else's cells without certificates. Before the contract we check registration, own production versus assembly, IEC 62619 and UN38.3 certificates for the cells and test reports. Our engineer matches the specification to your connection scheme: 0.4 or 10 kV, 50 Hz, protection settings, EMS compatibility with the solar plant and meters, and the grid operator's requirements for substations. Before shipment we run a FAT — factory acceptance test: full-capacity charge and discharge, BMS, inverter and fault-scenario checks, with a report and video. Diesel gensets are bench-tested at 100% load. You get equipment that commissions without rework and a full document pack: passport, test reports, certificate of origin, customs declaration.
Backup power for sites and residential buildings, and the usual mistakes
For short outages and instant switchover a BESS is better: it picks up the load with no gap and shaves peak tariffs. Long blackouts need a genset, and a genset + BESS + solar hybrid cuts fuel use noticeably because the engine only runs at its optimal load. For charging-hub operators we ship DC chargers together with BESS, and for corporate fleets also EVs from China. Typical mistakes: buying cells without a UN38.3 report, which carriers will refuse; sizing a genset without the starting currents of pumps and lifts; ordering in November equipment that is needed in winter; importing panels or BESS without checking the codes against exemption 245 and overpaying VAT. We close these risks with manufacturer vetting, engineering sizing and a fixed turnkey price in the quote.
FAQ: Energy equipment
How much does a BESS battery storage system from China cost?
What does an energy kit for an industrial site cost?
Can BESS and solar panels be imported without VAT?
How much does a CHP unit from China cost?
How much does a package substation from China cost?
How much does a diesel generator from China cost landed?
How long does energy equipment take from China?
How are lithium-ion batteries and BESS shipped?
Get a turnkey price within 24 hours
Send the model, quantity and delivery city — a manager will reply with a fixed-price quote.